Progress barHow far along the way to a goal.
A track that fills as the work gets done, and the share of the goal beside it. Which goals are nearly there, and which ones lag.
- Answers How are we doing?
- Your data done and goal per item
- Items about 1 to 15
- Shows done as a share of the goal
- Excel and Power BI data bars or a bar on a track
What is a progress bar?
A progress bar is a track that fills from left to right as the work gets done, with the share of the goal written beside it. Every item gets the same track, whatever its size, because the bar shows how far along each one is, not how much it is. Finished items fill the whole track.
A team's goals for the quarter. Blog posts are done; training hours are less than halfway.
Why use a progress bar?
Because "how far along" is the question for every goal.
- Same track for all. 12 blog posts and 400 calls compare fairly.
- Instantly clear. A filling bar needs no explanation.
- Finished stands out. A full bar in another colour says done.
- Motivating. People like to watch a bar fill up.
How does a progress bar work?
Four steps build progress bars.
- Step 1 of 4The tracksOne empty track per goal, all the same length.
- Step 2 of 4Fill by shareDone divided by goal: 340 of 400 calls fill 85% of the track.
- Step 3 of 4Write the shareThe share at the end of each name.
- Step 4 of 4Finished goalsA full bar in green: 12 of 12 posts.
What are the parts of a progress bar?
Four parts, and each one has a job.
- Fillthe part already done
- Trackwhat is left to do
- Sharedone as a share of the goal
- Donea goal that is reached
How do you read a progress bar?
Three looks, in this order.
- Find what is doneBlog posts: 12 of 12.
- Find what lagsTraining hours: 18 of 40, under half.
- Check the counts340 of 400 calls, 42 of 60 customers.
What kinds of progress bar are there?
The same goals, three ways.
- Kind 1BarsA filling bar per goal.
- Kind 2RingsA filling ring per goal.
- Kind 3CountsDone of goal instead of the share.
Progress bars can be split into steps (3 of 5 stages done) or show time as a second mark (half the quarter has gone, so half the goal should be done).
When should you use a progress bar?
When each item has a goal and the question is how far along.
- each item has a clear goal
- the share done matters more than the amount
- items differ in size
- people track their own progress
- there is no goal (a bar chart)
- amounts should compare (a bar chart)
- quality bands matter (a bullet chart)
- it is one number (a KPI card)
Progress bar or bullet chart?
The share done, or the amount against a target.
The bullet chart shows the amount on each goal's own scale, with the target as a line, so readers see the numbers. The progress bars show only the share done, so the one goal that is finished and the one that lags stand out at once.
How do you make a progress bar?
Done and goal per item, in Excel or Power BI.
In Excel, a column of done divided by goal with conditional formatting > Data Bars (minimum 0, maximum 1) makes progress bars in cells. In Power BI, the table and matrix visuals draw data bars on a share measure; the KPI and gauge visuals show one item's progress.
What goes wrong with progress bars?
The most common mistake, and its fix: bars past 100%.
| Mistake | Why it hurts | Fix |
|---|---|---|
| Bars past the end | The track no longer means 100% | Stop at full, write the share |
| No share written | Readers guess from length | The share beside each bar |
| Effort as progress | 90% of the time is not 90% of the work | Measure finished work |
| Many colours | Nothing stands out | One colour, another for done |
| No goal stated | 85% of what? | Name the goal, or show counts |
Every chart for “How are we doing?”
Read on, step by step.
Does it fit your data? Try it.
Paste your table into Chart Compass, say what the chart should show, and see the charts that fit, drawn with your own numbers. It runs in your browser, so the data stays with you.