Short answer: a radial gauge shows one value as a filled arc between a minimum and a maximum, with a needle line for the target. Use it for one number where "how close to the goal?" is the question: percent of budget spent, capacity used, a satisfaction score. It has four wells: Value, Minimum value, Maximum value and Target value. Always set the maximum yourself: without it, Power BI puts the current value at the halfway point, so the arc is always half full.
The chart, part by part: What is a gauge chart? draws its parts and shows how to read one, its kinds and the mistakes to avoid.
Gauges are popular in dashboards and often used where a number alone would do. Used well, they show a value in its range at a glance: 72 out of 100, target 80, not there yet.
What does a gauge look like?
When is it the right visual?
Microsoft lists: progress toward a goal; a percentile measure like a KPI; the health of a single measure; information that is easy to scan. The gauge needs a natural range. A score from 0 to 100, a capacity of 500 seats, a budget: the minimum and maximum mean something. Revenue has no natural maximum, and a gauge of revenue with a made-up maximum misleads.
| The question | Visual |
|---|---|
| How full is it, against a known limit? | gauge |
| Are we ahead of target, and how did we get here? | KPI visual (value, target and trend) |
| What is the number? | card |
| Many values against their targets in a list | bullet chart (custom visual) or a table with conditional formatting |
How do you build one?
- In Visualizations pick Gauge.
- Drag the measure to Value. Mind the aggregation: Microsoft's example switches gross sales from Sum to Average in the field's drop-down.
- Drag the target measure to Target value: a needle line appears on the arc.
- Drag measures to Minimum value and Maximum value, or set fixed numbers in Format visual, Gauge axis (Min, Max, Target).
- Format the Data labels and Target label, and pick the fill colour under Colors; a conditional colour (fx) can turn the arc red below a threshold.
Why does the gauge look half full?
Without a maximum, Power BI sets it to twice the value, so the value always sits at the halfway point and the arc says nothing. Give it a maximum from the data:
Seats Sold = SUM ( Bookings[Seats] )
Seat Capacity = SUM ( Events[Capacity] )
Seats Target = [Seat Capacity] * 0.85Put Seats Sold in Value, Seat Capacity in Maximum value and Seats Target in Target value. With a slicer on one event, the gauge shows that event's seats against its own capacity.
For a percentage gauge, keep the maximum at 1 (100%):
Budget Used % =
DIVIDE ( SUM ( Spend[Amount] ), SUM ( Budget[Amount] ) )| Department | Spend | Budget | Budget Used % |
|---|---|---|---|
| Marketing | 410 K | 500 K | 82% |
| IT | 615 K | 600 K | 103% |
| HR | 95 K | 150 K | 63% |
A value over the maximum (IT at 103%) fills the whole arc. Set the maximum to 1.2 if overruns are normal and should be seen.
What goes wrong?
- No maximum. The value lands in the middle every time; set Maximum value.
- A gauge for a number with no limit. Revenue, visitors, orders have no natural maximum; use a card or KPI visual.
- A wall of gauges. Ten gauges take the space of a table that would show ten values against ten targets more clearly.
- Wrong aggregation. A dragged column is summed by default; a satisfaction score summed across answers is meaningless. Use a measure with the right aggregation.
Where can you check this?
Where do you start?
Use a gauge only when the number has a real range, and set minimum, maximum and target from measures. For "ahead or behind, and the trend", the KPI visual does more in the same space; for a plain number, the card.