Control chartNormal wobble or a real change.
A line over time between two limits. Inside them is normal wobble; a point outside them is a signal worth a look.
- Answers How far from plan or average?
- Your data one value per period, in order
- Periods about 20 or more
- Limits average ± 3 sigma
- Excel and Power BI a line chart with three lines
What is a control chart?
A control chart (also a process behaviour chart or Shewhart chart) draws one value over time with its average and two limits, usually three sigma above and below. Points inside the limits are the normal wobble of the process: no single one needs an explanation. A point outside, or a long run on one side of the average, is a signal that something real has changed.
A help desk tracks the average minutes to answer a call, every day for 20 days. Every day wobbles between 3.7 and 4.5 minutes, except day 12, which jumps to 6.4: outside the upper limit, so something happened that day.
Why use a control chart?
Because reacting to every wobble wastes time, and missing a real change costs more.
- Noise or signal. The limits say which ups and downs are normal.
- Fewer false alarms. No meeting about a day that was just a bit worse.
- Real changes show. A point outside the limits is worth a look.
- Proven. Used in factories, hospitals and service teams for a hundred years.
How does a control chart work?
Four steps add the average and limits to a line.
- Step 1 of 4The values in orderOne point per day, in time order.
- Step 2 of 4The averageThe line of daily values wobbles around a middle.
- Step 3 of 4The limitsThree sigma above and below the average, from the typical day-to-day jump.
- Step 4 of 4Mark what is outsideA point beyond a limit is drawn large: a signal.
Sigma here comes from the average jump between neighbouring days, not from all values at once, so one wild day does not widen its own limits much.
What are the parts of a control chart?
Four parts, and each one has a job.
- Averagethe middle of the process
- Upper limitthe highest normal value
- Lower limitthe lowest normal value
- Signala point outside the limits
How do you read a control chart?
Three looks, in this order.
- Look for points outsideDay 12 is above the upper limit: find out what happened.
- Look for long runsNo long run on one side of the average: the rest is stable.
- Leave the wobble aloneDays 8 and 9 look different, but both are inside the limits: normal.
Other common signals: eight or more points in a row on one side of the average, or six in a row going up or down.
What kinds of control chart are there?
The same days, three ways.
- Kind 1Individuals chartOne value per day, limits from the day-to-day jumps (XmR).
- Kind 2Line onlyThe same values with no limits: every wobble looks like news.
- Kind 3Values as dotsAll days on one line: day 12 stands apart, but the order in time is lost.
Factories also use charts for averages of small samples (X-bar and R), for shares of defects (p charts) and for counts (c charts); the idea is the same.
When should you use a control chart?
When you watch a repeating process and must decide when to act.
- the same process repeats (days, batches, calls)
- you need to tell noise from change
- there are about 20 points or more
- the order in time is known
- you compare items, not periods (a bar chart)
- there are few points (a line chart)
- you need a forecast (a line with a forecast)
Control chart or line chart?
Limits for decisions, a plain line for the trend.
On the line chart, every bump looks like a story, and day 9 (4.5) may get as much attention as day 12. The control chart draws the line between normal and unusual: only day 12 needs an answer.
How do you make a control chart?
A line chart with three extra lines.
In Excel, add columns for the average (=AVERAGE), the moving range (=ABS(value - previous)) and the limits (average ± 2.66 × average moving range, the same as 3 sigma here), and draw all of them as a line chart. In Power BI, measures for the same lines on a line chart, or the Analytics pane's average line plus constant lines for the limits (the Analytics pane); anomaly detection marks unusual points automatically.
What goes wrong with control charts?
The most common mistake, and its fix: limits that are really targets.
- someone draws "at most 5 minutes" as the upper limit
- it says nothing about the process's normal wobble
- compute the limits from the process itself
- draw a target, if needed, as a separate line
| Mistake | Why it hurts | Fix |
|---|---|---|
| Targets drawn as limits | Normal wobble looks like a problem | Limits from the data, target apart |
| Sigma from all values at once | Wild points widen their own limits | Sigma from the moving range |
| Reacting to points inside | Chasing noise | Act only on signals |
| Too few points | Limits are unreliable | About 20 points or more |
| Never redrawing limits | Old limits after a real change | New limits after a known change |
Every chart for “How far from plan or average?”
- Against zero or averageDiverging bar chartBars to the left and right of a middle line.
- Against zero or averageSurplus and deficit chartA line filled above and below zero in two colours.
- Against a planVariance chartActual against plan, the difference coloured up or down.
- Survey answersDiverging stacked barAgree to the right, disagree to the left, for survey scales.
Read on, step by step.
Does it fit your data? Try it.
Paste your table into Chart Compass, say what the chart should show, and see the charts that fit, drawn with your own numbers. It runs in your browser, so the data stays with you.