Step chartA line that jumps and holds.
A line that stays flat while the value holds and jumps when it changes. Made for prices, rates and anything set at a moment.
- Answers How did it change?
- Your data a value per change
- Changes 3 to about 50
- Lines 1 to 3
- Excel and Power BI from a line chart
What is a step chart?
A step chart is a line chart where the value stays flat until it changes, then jumps straight up or down. Flat parts are periods with no change, risers are the moments it changed. It shows values that are set at a moment and hold, like a price, an interest rate or a fee.
A café changes the price of a coffee a few times over two years. A normal line would slope between the changes, as if the price crept up every day. A step chart holds each price flat until the day it changed.
Why use a step chart?
Because it draws values that change in jumps exactly as they behave.
- True to the data. A price that holds for months is drawn flat, not as a slope.
- The moments of change stand out. Each riser is one decision or event.
- How long a value lasted shows. A long flat part is a long time without change.
- The size of each change shows. A tall riser is a big jump.
How does a step chart work?
Four steps, from a list of changes to steps.
- Step 1 of 4Time along the bottomThe quarters go left to right, the price up the side.
- Step 2 of 4Hold, then jumpThe line stays flat while the price holds and rises straight up when it changes.
- Step 3 of 4Write each new valueA label at each change gives the new price.
- Step 4 of 4Compare with a lineA normal line would slope between the changes, as if the price crept up.
What are the parts of a step chart?
Four parts, and each one has a job.
- Flat partthe value holding, with no change
- Riserthe moment it changed; its height is the jump
- Value axisthe scale up the side
- Time axisthe moments, left to right
How do you read a step chart?
Three looks, in this order.
- Read the levelsEach flat part is a price that held: 2.80 for two quarters, then 3.10.
- Find the jumpsEach riser is a change. Count them: three changes in six quarters.
- Compare the sizesThe tallest riser is the biggest jump: 30 cents in Q3 and again in Q5.
What kinds of step chart are there?
Steps can show one value or several.
- Kind 1Two pricesTwo step lines on one scale, one colour each.
- Coffee
- Tea
- Kind 2One litFade the other to talk about one price.
- Coffee
- Tea
- Kind 3As linesThe same numbers as normal lines: they slope where nothing changed.
- Coffee
- Tea
When should you use a step chart?
When a value is set at moments and holds in between.
- the value changes at moments and holds (prices, rates, fees, headcount)
- the timing of each change matters
- there are 1 to 3 series
- the value changes all the time (a line chart)
- there are only two moments (a slope chart)
- you show amounts per period (a column chart)
Step chart or line chart?
Steps for values that jump, lines for values that flow.
The line chart draws a slope from Q2 to Q3, as if the price rose a little every day. The step chart holds 2.80 until the day it became 3.10. For temperatures or sales that change all the time, the line is right; for prices and rates, the steps are.
How do you make a step chart?
From a line chart in Excel and Power BI.
In Excel, repeat each value with the date of the next change, so every change has two rows, and draw a line chart with a date axis. In Power BI, the line chart has a Stepped option in the line format settings. In Python, matplotlib draws one with plt.step.
What goes wrong with step charts?
The most common mistake, and its fix:
- the new value is drawn from the day after it started
- a price rise looks a quarter late
- the riser sits on the date the value changed
- the new level starts that day
| Mistake | Why it hurts | Fix |
|---|---|---|
| Steps for values that change all the time | It looks jagged and false | A line chart |
| The riser on the wrong side | Changes look early or late | Put the jump on the date it happened |
| Missing the last level | The current value is cut off | Extend the last level to today |
| Too many series | The steps tangle | One to three lines |
| No labels at the changes | The new values must be read off the axis | Write each new value |
Every chart for “How did it change?”
- LinesLine chartPoints in time joined by a line, for the shape of a trend.
- LinesSparklineA tiny line without axes next to a number, for the trend at a glance.
- LinesIndex chartEvery line starts at 100, so growth compares fairly across sizes.
- LinesSlope chartTwo moments and a line per item, to see who rose and who fell.
- LinesConnected scatter plotTwo measures over time, the points joined in the order they happened.
- AreasArea chartA line chart with the space below filled, for amounts over time.
- AreasStacked area chartLayers stacked over time, for a total and the parts that build it.
- Areas100% stacked area chartLayers that always fill the height, for shares over time.
- AreasStreamgraphFlowing layers around a centre line, for many series that rise and fall.
- AreasHorizon chartA line chart folded into bands of colour, for many series in little space.
- Columns and linesCombo chartColumns and a line on one chart, for an amount and a rate together.
- Rank over timeBump chartRanks over time, one line per item, to follow who moves up and down.
- Rank over timeRibbon chartStacked columns joined by ribbons, the largest always on top.
- Patterns in timeCalendar heatmapEvery day a square on a calendar grid, busy days darker.
- Patterns in timeCycle plotEach month or weekday as its own little line, for seasons.
- PricesCandlestick chartOpen, high, low and close for each period, the way prices are shown.
- EventsTimelineEvents placed on a line in the order they happened.
Read on, step by step.
Does it fit your data? Try it.
Paste your table into Chart Compass, say what the chart should show, and see the charts that fit, drawn with your own numbers. It runs in your browser, so the data stays with you.