Donut chartA pie with room in the middle.
A ring cut into parts of one whole, with the middle free for the total. The same job as a pie, with a place for the headline number.
- Answers What share does each part have?
- Your data parts of one total
- Parts 2 to 5
- Middle the total or one share
- Excel and Power BI built in
- Chat
- Phone
What is a donut chart?
A donut chart is a pie chart with a hole in the middle. The shares sit on a ring, and the middle holds a number: the total, or the share that matters. It shows parts of one whole and a headline in one picture, which is why dashboards like it.
A help desk closes 480 tickets in a month, by phone, chat and email. A donut puts 480 in the middle and the three channels around it: chat already handles half.
Why use a donut chart?
Because it shows the split and the total in the same spot.
- A headline in the middle. The total, or one key share, sits where the eye lands.
- Parts of a whole. Like a pie, the full ring is 100%.
- Compact. It fits a dashboard tile.
- Built in. Excel and Power BI draw it in a click.
How does a donut chart work?
Three steps turn amounts into a ring.
- Step 1 of 3The whole as a ring480 tickets: the full ring, and the total in the middle.
- Chat
- Phone
- Step 2 of 3A part per shareChat is 240 of 480, so it takes half the ring.
- Chat
- Phone
- Step 3 of 3Write the sharesThe per cent on each part.
- Chat
- Phone
What are the parts of a donut chart?
Four parts, and each one has a job.
- Chat
- Phone
- Partone share of the ring
- Sharethe per cent, written on the ring
- Middlethe total, or the share that matters
- Startthe first part starts at twelve o'clock
How do you read a donut chart?
Three looks, in this order.
- Read the middle480 tickets in all.
- Chat
- Phone
- Find the biggest partChat takes half the ring: 240 tickets.
- Chat
- Phone
- Read the restPhone is the smallest part, under a fifth.
- Chat
- Phone
What kinds of donut chart are there?
The same shares, three ways.
- Kind 1DonutA ring with the total in the middle.
- Chat
- Phone
- Kind 2One part litOne part in colour: the share that matters.
- Chat
- Phone
- Kind 3PieNo hole, no total.
- Chat
- Phone
When should you use a donut chart?
When a few parts make one whole and a number belongs in the middle.
- the parts add up to one whole
- there are 2 to 5 parts
- a total or one key share is the headline
- space is a dashboard tile
- there are many parts (a bar chart)
- the parts are close in size (a bar chart)
- several wholes are compared (100% stacked bars)
- progress to a goal is the point (a progress bar)
Donut chart or pie chart?
A donut when the middle has a job, a pie when it does not.
- Chat
- Phone
- Chat
- Phone
Both show the same split. The pie chart shows angles from the centre; the donut shows arcs on a ring, which read about as well. Pick the donut when the middle carries a number; pick the pie when it would only hold empty space.
How do you make a donut chart?
Built in everywhere: Excel, Power BI, Google Sheets and Python.
In Excel, choose Insert > Pie chart > Doughnut and put the total in a text box in the middle. In Power BI, it is the donut chart visual; a card on top of it holds the total. The settings are in donut charts in Power BI. In Python, matplotlib draws one with plt.pie(..., wedgeprops={'width': 0.4}).
What goes wrong with donut charts?
The most common mistake, and its fix: a donut as a progress bar.
- "62% done" as a ring with one part and a grey rest
- it takes much room for one value
| Mistake | Why it hurts | Fix |
|---|---|---|
| Too many parts | Thin arcs can't be compared | 2 to 5 parts, or bars |
| An empty middle | Wasted space | The total or the key share |
| A ring too thin | Arcs are hard to see | About a third of the radius |
| Several donuts side by side | Arcs across rings can't be compared | 100% stacked bars |
| One part and a grey rest | A big picture for one number | A progress bar or a big number |
Every chart for “What share does each part have?”
- One wholePie chartA circle cut into slices, for a few shares of one total.
- One wholeWaffle chartA grid of 100 squares, each one per cent.
- One wholeParliament chartSeats in a half circle, coloured by party.
- Shares across groupsStacked bar chartBars split into parts, for totals and what makes them up.
- Shares across groups100% stacked bar chartEvery bar the same length, split into shares.
- Shares across groupsMarimekko chartStacked bars whose width is also a value, for two levels of share.
- Nested partsTreemapRectangles sized by value, nested by level.
- Nested partsSunburst chartRings of a hierarchy, from the centre out.
- Nested partsIcicle chartA hierarchy as rows of blocks, each split into its children.
- Nested partsCircle packingCircles inside circles, sized by value, for a hierarchy.
- Building up to a totalWaterfall chartSteps up and down from a start to an end, for what changed a total.
- Building up to a totalPolar area chartWedges of equal angle whose length shows the value.
Read on, step by step.
Does it fit your data? Try it.
Paste your table into Chart Compass, say what the chart should show, and see the charts that fit, drawn with your own numbers. It runs in your browser, so the data stays with you.