Waterfall charts in Power BI: from start to end value

How a waterfall (bridge) chart in Power BI explains the change from a start value to an end value, the Category and Breakdown fields, sorting, the DAX for a revenue bridge, and the mistakes that break it.

Short answer: a waterfall chart, also called a bridge chart, shows a running total as values are added and taken away: each change is a floating column, increases and decreases in their own colours, and a Total column at the end. Use it to explain why a number moved: last year's revenue to this year's, opening to closing headcount, budget to actual. It takes a Category (the steps), a Y-axis measure (the change) and an optional Breakdown that splits each step into its biggest contributors.

The chart, part by part: What is a waterfall chart? draws its parts and shows how to read one, its kinds and the mistakes to avoid.

"Revenue grew 40 thousand" is a fact. "New customers added 120, prices 40, churn took 90 and discounts 30" is an explanation. The waterfall draws the second sentence.

What does a revenue bridge look like?

02004006008005002025 revenue+120New customers+40Price-90Churn-30Discounts5402026 revenue
From 2025 revenue to 2026 revenue (in thousands)

The first column starts from the axis, each change floats where the last one ended, and the last column is the result: 500 + 120 + 40 - 90 - 30 = 540.

Microsoft lists the common uses: changes of a measure over time or across categories, auditing the big changes behind a total, profit built from its revenue and cost lines, headcount from the start to the end of a year, and a running balance of money earned and spent per month.

How does Power BI build it?

  1. In Visualizations pick Waterfall chart.
  2. Drag the measure of change to Y-axis and the steps to Category (for example the month, or a "Bridge Step" column).
  3. Power BI adds a Total column at the end and colours increases, decreases and the total differently (Format visual, Columns sets the three colours).
  4. Optional: drag a field to Breakdown, for example the territory. Each step is split into its biggest contributors, and Breakdown, Maximum breakdowns sets how many (the top ones by absolute value); the rest are grouped.

By default the steps are in ascending or date order. More options (...), Sort axis sorts by the category or by the value, which turns a monthly waterfall into "biggest gains first, biggest losses last".

What DAX makes a bridge between two years?

A month-by-month waterfall is easy: the change per month is the measure. A bridge between two totals needs a small table of steps and a measure that returns each step's value. The steps:

Bridge Steps =
DATATABLE (
    "Step", STRING, "Order", INTEGER,
    {
        { "New customers", 1 },
        { "Price", 2 },
        { "Volume of existing customers", 3 },
        { "Churn", 4 }
    }
)

Sort Step by Order in the model. The measure picks the right calculation per step:

Revenue Change =
VAR ThisYear = [Revenue]
VAR LastYear = CALCULATE ( [Revenue], SAMEPERIODLASTYEAR ( 'Date'[Date] ) )
RETURN
    SWITCH (
        SELECTEDVALUE ( 'Bridge Steps'[Step] ),
        "New customers", [Revenue from New Customers],
        "Price", [Price Effect],
        "Volume of existing customers", [Volume Effect],
        "Churn", - [Revenue Lost to Churn],
        ThisYear - LastYear
    )

The last argument of SWITCH is what the Total column shows: the whole change, which must equal the sum of the steps. If it does not, a step is missing or counted twice, and the chart shows it as a gap between the last floating column and the total. Price, volume and mix analysis writes the price and volume measures.

Waterfalls in Power BI start from zero and show only changes, so the starting value appears as the first step: add a step "2025 revenue" that returns LastYear, and the Total column becomes 2026 revenue.

What else can it show?

01002003004002401 January+58Hires+6Transfers in-41Leavers-9Transfers out25431 December
Headcount from 1 January to 31 December

The same shape works for cash (opening balance, inflows, outflows, closing balance) and for a budget against actual bridge (budget, then each variance, then actual).

What goes wrong?

  • Steps that do not add up. The total is the sum of the columns; a step left out makes the bridge lie. Check sum of steps = end - start in a card.
  • Too many steps. Twenty small steps read like noise. Keep the five or six biggest and put the rest into "Other".
  • Signs flipped. Costs and churn must be negative in the measure; a positive churn makes the bar go up.
  • The breakdown hiding the story. Breakdown with five contributors per step multiplies the columns. Use it to explore, then set Maximum breakdowns low for the report.
  • Months sorted by value by accident. A time waterfall sorted by value loses its timeline; check Sort axis.

Where can you check this?

Where do you start?

Start with a month-by-month waterfall of one change measure, then build a two-year bridge with a step table when the question is "why". Year over year in DAX covers the last-year measure, and budget variance uses the same bridge for budget against actual.

Keep reading

More from the blog.

Every post

Next

Building this? Say hello.

A question about this post, a pattern you would build differently, or the next thing you want written out: Behnia reads every message.